Your Shopping Cart
GUIDELINES FOR INSPECTING USED FRP EQUIPMENT
Provider: TAPPI
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Shipping: Available for download - Link will be provided in My ComplianceOnline section
Price:
$35.00
Product Details
- This document describes how “used” iber-reinforced plastic (FRP) tanks and vessels should be formally inspected to determine their condition , which must be known to assess fitness for continued service.
- Three phases of inspection are defined – external inspection when the vessel is in service; external and internal inspections when then the vessel is removed from service. All three inspection phases must be carried out for the inspection to be considered complete.
- These inspection guidelines also can be applied to all laminated construction FRP components, including stacks, hoods, ducts, piping and “dual laminate” equipment; i.e., FRP with an integral thermoplastic corrosion barrier.
- This document does not discuss criteria for repair, repair methods and procedures, or criteria for assessing the fitness-for-service of FRP tanks and vessels.
It Provides information on:
- Safety precautions.
- Basic Structure of FRP Tanks and Vessels.
- Inspection Philosophy.
- Inspection Frequencies.
- Inspection Preparation.
- External Inspections.
- Radiographic Inspection (RT).
- Radiographic Inspection (RT).
- Component Data File.
- Acoustic Emission Testing (AET).
Who will benefit:
- Quality Manager.
- Engineers.
- Maintenance Manager.
- Safety Manager.
- Supervisor.
Customers Also Bought
- UIDELINES FOR SPECIFICATION AND INSPECTION OF ELECTRIC RESISTANCEWELDED (ERW) AND SEAMLESS BOILER TUBE FOR CRITICAL AND NONCRITICALSERVICE
Price: $35 BUY NOW - INSTALLATION AND REPAIR OF PIN STUDS IN BLACK LIQUOR RECOVERY BOILERS
Price: $35 BUY NOW - WELD REPAIRS ON NEW SUCTION ROLL SHELLS
Price: $35 BUY NOW - Ultrasonic testing (UT) for tube thickness measurement in black liquor recovery boilers: Part I - Guidelines for accurate tube thickness testing; Part 2 - Default layouts for tube thickness surveys in various boiler zones
Price: $35 BUY NOW - Guidelines for nondestructive examination of suction roll shells
Price: $35 BUY NOW - GTAW ROOT PASS WELDING OF 6% MOLYBDENUM AUSTENITIC STAINLESS STEEL PIPE - OPEN ROOT JOINT WITH HAND-FED FILLER
Price: $35 BUY NOW
You Recently Viewed